
Sadid Mahan Company, one of the supreme manufacturers of metal structures in the southeast of Iran, has commenced its operation in Kerman since 1978. The company has provided construction and Erection of various skeletal structures whether industrial or non-industrial, industrial sheds, urban grade-separation structures with the capacity of 12000 tonne in a year as well as merchandising 30000 tons of steel products. The company has pushed ahead with the steel industry via acquiring numerous standard quality certificates, utilizing appropriate equipment and employing over 100 specialists in production and commerce.
Sadid Mahan Company with the trust in Allah, knowledge, grit, specialists, experiences and modern technologies has done its best to human beings in provision of high-grades.
Sadid Mahan Company with the trust in Allah, knowledge, grit, specialists, experiences and modern technologies has done its best to human beings in provision of high-grades.
Download Resume
Some implemented projects
Fields of activity
Construction and installation of all types of light and heavy structures
Building and installing industrial and non-industrial sheds
Manufacturing residential and industrial structures whether with welded or bolted joints
Making all kinds of industrial structures
Certificates and Quality Standards
Quality Control Unit
This unit was established with the aim of increasing quality of all pieces from the moment they enter as raw materials to the point of time they will exit as metal structures in addition to the purpose of stable improvement of products



Acknowledgments
industrial projects requires a systematic approach towards planning, controlling, and the way of implementing projects with respect to time and cost. The reason of existence of such unit is to direct projects according to the specified schedule or finance and to reach aims, final products, and useful data. Assuredly, this unit rationalizes time, cost, and quality during implementation of projects.
Significant Roles of Production Planning and Project Controlling Unit:
Significant Roles of Production Planning and Project Controlling Unit:
- presenting the schedule of the project with MSP and Primavera software
- determining the work breakdown structure(WBS) in order to conduct the project correctly without any kind of overlap
- preparing reports related to the progress of the project according to the demand of the principal
- provision of the project’s statement
- analyzing the production line
